Removing Flags
2014 – Contributed by Andrew Coe
James Sweed removes some flags as part of the Dining Hall Renovation project.
Staff Plaques
2014 – Contributed by Andrew Coe
George Quay removes some of the staff plaques at the Dining Hall as part of the renovation project.
Plaque Pile
2014 – Contributed by Andrew Coe
The plaques removed during the renovation project sat in one big pile in the middle of the dining hall.
Moving Benches
2014 – Contributed by Andrew Coe
Octoraro 22 Arrowmen and Crew 23 moved a lot of benches and tables to provide enough room for insulation work during the Camp Ware Dining Hall Renovation project.
Dining Hall Construction
2014 – Contributed by Andrew Coe
The Octoraro Lodge 22 Carpentry Crew does renovation work on the Camp Ware Dining Hall.
Dining Hall Renovation
2015 – Contributed by Ray Hayden
The Ware Dining Hall gets some carpentry renovation on the interior as part of the Octoraro Lodge 22 project.
Carpentry in the Dining Hall
2015 – Contributed by Ray Hayden
Ron Rosenberry works on some carpentry inside the Camp Ware Dining Hall as part of the Octoraro Lodge 22 renovation project.
Windows Framed In
2015 – Contributed by Andrew Coe
The Dining Hall windows get framed in as part of the Octoraro Lodge 22 Ware Dining Hall project.
Dining Hall Construction
2016 – Contributed by Anonymous
Dining Hall Construction continues at the Ware Dining Hall. Insulation and ceiling work are one of the phases getting everything closer to completion.
Dining Hall Renovation
2016 – Contributed by Anonymous
The drop ceiling has been added to the Camp Ware Dining Hall.
Construction Scaffolding
2016 – Contributed by Andrew Coe
The Dining Hall has a drop ceiling put in as part of the final stages of construction.
Ceiling Construction
2016 – Contributed by Andrew Coe
The Dining Hall has a drop ceiling installed with insulation as one of the final stages of the renovation.
Protective Coating
2016 – Contributed by Ray Hayden
Here a protective coating is being applied to the ceiling which helps to soundproof the dining hall and remove the echo.
Protective Coating
2016 – Contributed by Ray Hayden
Here a protective coating is being applied to the ceiling which helps to soundproof the dining hall and remove the echo.
Protective Coating
2016 – Contributed by Ray Hayden
Here a protective coating is being applied to the ceiling which helps to soundproof the dining hall and remove the echo.
Lighting Installed
2016 – Contributed by Ray Hayden
Lighting is installed in the renovated Camp Ware Dining Hall.