Parade Field Wall
2010 – Contributed by Anonymous
This wall was added in 2009-2010 as part of the HSRAA’s Picnic Grove rehabilitation project.
Parade Field Wall
2010 – Contributed by Anonymous
This photograph shows the top end of the extended wall that stretches from the top of the Camp Horseshoe parade field to the bottom of the field.
Berm Construction
2014 – Contributed by Andrew Coe
In this panoramic, the berm has been constructed to divert water from the Picnic Grove and Goodman Pavilion areas to Campcraft where it runs through gravel down past the Quonset Hut.
Berm Construction
2014 – Contributed by Andrew Coe
Here we see the berm construction as part of the HSRAA Picnic Grove Rehabilitation project.
Culvert Widening
2014 – Contributed by Andrew Coe
As part of the water diversion project, the culvert near the Quonset Hut and Greenbriar was widened considerably to deal with the additional water flow.
Picnic Grove Path
2015 – Contributed by Andrew Coe
The path has been set and some excavation work accomplished for the HSRAA Picnic Grove rehabilitation project.
Picnic Grove Rehabilitation
2015 – Contributed by Andrew Coe
Ranger Chris Wilder fixes a water pipe that was a temporary casualty in the Picnic Grove rehabilitation project.
Watering the Grass Seed
2015 – Contributed by Anonymous
Ranger Chris Wilder waters the new grass seed for the Picnic Grove as part of the HSRAA Picnic Grove Rehabilitation Project.
Walkway Blueprint
2011 – Contributed by Richard T. Bensing
Here is one of the blueprints that included a shelter over the walkway that now extends from the parking lot through Picnic Grove.
Pavilion Construction
2017 – Contributed by Jake Segal
The Picnic Grove pavilion construction underway in 2017.
Pavilion Construction
2017 – Contributed by Jake Segal
The Picnic Grove pavilion construction underway in 2017.
Pavilion Nearly Complete
2017 – Contributed by Anthony J. DiAntonio
The Picnic Grove pavilion is nearly finished in this photo – it just needs some lighting and some gravel for the base.
Pavilion Nearly Complete
2017 – Contributed by Anthony J. DiAntonio
The Picnic Grove pavilion is nearly finished in this photo – it just needs some lighting and some gravel for the base.
Alumni Pavilion
2017 – Contributed by Andrew Coe
As part of the Picnic Grove reclamation project, the Alumni Pavilion was constructed in 2017 as an additional location for MB classes and Saturday evening picnics.
Tree Planting
2017 – Contributed by Andrew Coe
New trees were planted in the Picnic Grove as part of the HSRAA picnic grove rehabilitation project.