Working on the Trail
2026 – Contributed by Andrew Coe
John McCabe (left) works with ordeal candidates and members in building the pool trail during the 2026 June Service Weekend.
Working on the Pool Trail
2026 – Contributed by Andrew Coe
During the 2026 June Service Weekend, members and candidates start raking out the dirt on the pool trail.
The Downward Slope
2026 – Contributed by Andrew Coe
Here is a picture of the steepest part of the pool trail which was rehabilitated at the 2026 June Service Weekend.
Setting the Water Bar
2026 – Contributed by Andrew Coe
This adult member works with you to install a water bar on the pool trail during the 2026 June Service Weekend.
Raking Out the Trail
2026 – Contributed by Andrew Coe
Youth members and candidates work to rake out the dirt on the pool trail during the 2026 June Service Weekend.
Putting in Gravel
2026 – Contributed by Andrew Coe
Gravel is raked out on the pool trail during the 2026 June Service Weekend.
Pool Trail
2026 – Contributed by Andrew Coe
At the 2026 June Service Weekend, a long stretch of the pool trail is complete with new water bars and gravel.
Examing the Water Bars
2026 – Contributed by Andrew Coe
Near the bottom of the pool trail, those working on it discuss the runoff location around the water bar on the steepest part of the trail.
Discussing the Water Flow
2026 – Contributed by Andrew Coe
Workers discuss how to divert water on the pool trail during the 2026 June Service Weekend.
Pool Trail Work
2026 – Contributed by Sammy Roworth
Amongst others, Billy Blankmeyer came down for a day in late May 2026 to work on the Camp Horseshoe Pool trail, which was in dire need of repair.
Pool Trail Workers
2026 – Contributed by Sammy Roworth
Amongst others, Sammy R. (left) and Billy Blankmeyer came down for a day in late May 2026 to work on the Camp Horseshoe Pool trail, which was in dire need of repair.